The owner's first screen — the business at a glance: how much you earned, net profit, what the crews are working on, and what needs attention. The team runs day-to-day operations — you see the results and stay in control.
Revenue · July
₴2,58 M
▲ 11,2%
Net profit
₴690 K
27% margin
Sites closed
312
▲ 8,4%
Leads in progress
12
4 new awaiting
Crews today
6/8 in the field
2 available
Where the money went · July
Of ₴2,58 M in revenue — ₴690 K remained as net profit
Materials1,02 M ₴ · 40%
Crew payments0,72 M ₴ · 28%
Other expenses0,17 M ₴ · 7%
Net profit0,69 M ₴ · 27%
Crews right now
today's workload · sites
| CR-01Koval Roofing | ⚠ 3/3 · overloaded |
| CR-03Moroz Electrical | ⚠ 3/3 · overloaded |
| CR-06Savchuk Plumbing | ● 2/3 · 1 slot open |
| CR-02Polishchuk Plumbing | ● 1/3 · slot open |
| CR-07Levchuk Electrical | ● 0/3 · available |
Leads — monthly flow
From inquiry to closed site
New
4
Approved
3
In progress
12
Closed
312
Lead → site conversion: 63% · average site value 8 270 ₴
Needs your attention
2 crews are overloaded today — some leads are on hold until tomorrow.
₴214 K in cash not yet turned in (3 crews) — worth a reminder.
Teslenko Crew: warranty callbacks at 9,4% — above norm, worth a quality check.
Revenue is growing for the 3rd month running (+11,2% vs June).
Trades Crew supports
One product for any field crew — the trades active for you are highlighted, enable the rest as needed
Roofing
Electrical installation
Plumbing / Heating
Ventilation / HVAC
Solar power systems
Appliance repair
Finishing works
Cleaning
📥
Leads from the website 🌐, Telegram bot ✈️, and phone calls 📞 land here automatically with the status "New". Drag cards between columns, click one — a details panel opens where you can change the status.
All trades
🏠 Roofing
⚡ Electrical
🔧 Plumbing
limit 3 sites / crew / day
🆕 Unassigned sites 3 — came from approved leads · drag onto a crew
🏠 Roofing
2 crews
CR-01Koval CrewRoofing
"Pitched Roofs"
8:30
Lychakivska St, 108
Roof replacement · metal tile
12:00
Pasichna St, 24
Roof repair · patching + gutters
16:00
Sokilnyky village
Rafter system installation
⚠ 3/3 · overloadedassignments blocked
CR-05Teslenko CrewRoofing
"Flat Roofs"
9:00
Naukova St, 7 (mall)
Roof waterproofing · membrane
14:00 — open slot
● 1/3 · slot open
⚡ Electrical
2 crews
CR-03Moroz CrewElectrical
"Panels & Grounding"
9:00
Rynok Square, 4
Panel installation · office
12:30
Pasichna St, 56
RCD + grounding
15:30
Lychakivska St, 24
Cable trunking, office
⚠ 3/3 · overloadedassignments blocked
CR-07Levchuk CrewElectrical
"Lighting & Outlets"
9:00 — open slot
13:00 — open slot
● 0/3 · available
🔧 Plumbing
2 crews
CR-02Polishchuk CrewPlumbing
"Riser Replacements"
8:30
Zelena St, 142
Riser replacement · stairwell
13:00 — open slot
● 1/3 · slot open
CR-06Savchuk CrewPlumbing
"Turnkey Piping"
9:00
Boykivska St, 11
Water heater installation
13:00
Stryiska St, 90
Water piping · apartment
● 2/3 · 1 slot open
🔔 System notifications
⚠️
Moroz Crew is overloaded (3/3). Next opening — tomorrow.
📅
Koval Crew: already has a site on Fri Jul 10 — watch their workload.
✅
Levchuk Crew is free today (0/3).
🤖 Dispatcher AI Assistant
💡
Each row is a live site card: estimate → contract → work order for the crew → photos → completion certificate. Click any row ↓
All
New
In progress
Closed
Warranty
🔍
| Code | Site / address | Crew | Type of work | Amount ₴ | Trade | Status | Date |
|---|
🧑🔧
All tradespeople and foremen. Click a card to open the worker's profile (skills, documents, crew, contact). Add people first, then group them into crews.
All
🏠 Roofing
⚡ Electrical
🔧 Plumbing
No crew
👷
Crews built around your payout model (labor + materials, rates, levels). Click a card to open the crew page: roster, +add people, stats, sites.
💰
How much came in as cash and card/bank transfer per crew — fully transparent for reporting. See at a glance where cash hasn't been turned in yet and where it's already approved.
Collected this period
₴1,84 M
▲ 9,1%
💵 Cash
₴1,07 M
58%
💳 Card / transfer
₴0,77 M
42% · IBAN/card
Awaiting handover
₴214 K
3 crews
Revenue collection by crew
Period Jul 1–15, 2026 · collection cycle #1 · cash / card breakdown
| Crew | Trade | 💵 Cash ₴ | 💳 Card ₴ | Total ₴ | Turned in | Status |
|---|
Week
Month
Quarter
Year
Sites closed
312
▲ 8,4%
Revenue, ₴
2,58 M
▲ 11,2%
Average site, ₴
8 270
▲ 2,6%
Materials, ₴
1,02 M
▲ 5,1%
Warranty, %
5,2%
▼ 1,8%
Revenue: cash + card
July 2026 · ₴ thousands
Cash
Card
Cash on-site: 1,50 M ₴
Card / transfer / IBAN: 1,08 M ₴
Crew ranking
Top by revenue · July
| Crew | Sites | Revenue ₴ | Warranty |
|---|---|---|---|
| CR-01Koval Roofing | 44 | 548 600 | 3,1% |
| CR-06Savchuk Plumbing | 58 | 412 200 | 4,2% |
| CR-03Moroz Electrical | 51 | 362 400 | 6,8% |
| CR-02Polishchuk Plumbing | 49 | 311 900 | 4,9% |
| CR-05Teslenko Roofing | 37 | 286 300 | 9,4% |
🗺️
All sites on the map of Lviv. Click a site in the list or on the map — a side panel with details opens. 🟠 orange — not yet assigned to a crew.
🔌 Connections to banks, tax authorities, e-signature, and messengers. This is a separate layer — added once the operational core is already running. Click a card.
All trades
🏠 Roofing
⚡ Electrical
🔧 Plumbing
| Code | Site | Crew | Type of work | Amount ₴ | Trade | Date |
|---|
📑 Document and report generation for accounting. Click one — the system will generate the document for the current period.
Recently generated